Skip to main content

Between vineyards and forests in the Mâconnais | House in Azé

10.0 (1 Review) |   Pet Friendly   3 Bedrooms  3 Bathrooms  9 Guests
Aze House | Between vineyards and forests in the Mâconnais

3 Bedroom House in Aze, Azé

Situated in a village, this welcoming vacation home brings all of Aze within your reach. With the property's convenient onsite parking, you'll be ready to make the quick 6-minute drive to The Caves of Azé or the 6-minute drive to Azé Caves.

After you return to this 1292-sq-ft vacation home, unwind in the garden or sip a drink on the deck or patio, and don't forget about the outdoor furniture. As for the great indoors, you can come inside and enjoy the free WiFi, TV, and stereo.

This 3-bedroom, 3-bathroom rental features a living room and a BBQ grill. Bathroom amenities include a hair dryer, towels, and toilet paper. Prepare a home-cooked meal in the kitchen, complete with an oven, a stovetop, and a refrigerator, as well as a coffee maker, an electric kettle, and a microwave. And you won't have to pack extra clothes, because you'll also have access to laundry facilities.

Between vineyards and forests in the Mâconnais is located in Aze. Between vineyards and forests in the Mâconnais provides accommodation, featuring Internet, Parking, Designated Smoking Area, among other amenities. This House features Parking, Pet Friendly and Designated Smoking Area to make your stay a comfortable one.

Between vineyards and forests in the Mâconnais has 3 Bedrooms , 3 Bathrooms, and max occupancy of 9 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated House because of the excellent services rendered by the owner or manager of this House, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. House has a friendly neighborhood, and the Aze has interesting places to visit. If you want to learn more about the House in Aze, such as places to visit and things to do nearby, you can check below to learn more.

Show more
OneKey Logos

This Property is OneKey Eligible

Earn OneKeyCash for every dollar spent on eligible vacation rentals, villas, cottages, cabins, and more when you book on Vrbo.

JOIN TODAY

Amenities

Parking
Pet Friendly
Designated Smoking Area
TV
Balcony/Terrace
Sports/Activities
Bedding/Linens
Wellness Facilities
Entertainment
Barbecue/Outdoor Cooking
Child Friendly
Heating
Internet
Kitchen
Laundry

Facility Overview

Air Conditioner
  • Heating
Bathrooms
  • Shower
  • Hair dryer
  • Towels provided
  • 3 bathrooms
  • Toilet paper
Bedroom
  • Bed sheets provided
  • 3 bedrooms
  • Dining table
  • Living room
  • Wood stove
Kitchen
  • Electric kettle
  • Coffee/tea maker
  • Microwave
  • Dishwasher
  • Oven
  • Cookware/dishes/utensils
  • Refrigerator
  • Spices
  • Stovetop
Laundry
  • Washing machine
  • Laundry facilities
Parking
  • Onsite parking
  • Wheelchair-accessible parking and van parking available
Pet Friendly
  • Pet friendly
  • Welcoming cats and dogs only
  • 2 total (up to 55 lbs per pet)
Accessibility
  • Note from host: Non fumeur à l'intérieur dans l'ensemble du gîte
  • Stair-free path to entrance
  • Wheelchair-accessible parking
  • Wheelchair-accessible path of travel
  • If you have requests for specific accessibility needs, please contact the property using the information on the reservation confirmation received after booking.
  • Tile flooring in public areas
  • 3 on-site accessible parking spaces
  • Well-lit path to entrance
  • Designated smoking areas
  • No elevators
  • Wheelchair-accessible van parking
Entertainment
  • Games
  • Books
  • Stereo
  • TV
General
  • At least 80% lighting from LEDs
  • Unit size: 1292 sq ft (120 sq m)
  • Double-glazed windows
  • Recycling
  • Composting
  • Eco-friendly cleaning products provided
  • English
  • French
  • In a rural location
  • In a village
Guest Services
  • Travel crib
  • Children's books
  • Children's toys
  • Children's games
  • Change of towels (on request)
  • Limited housekeeping
  • Change of bedsheets (on request)
Internet
  • Free WiFi, with speed of 25+ Mbps
Outdoors
  • Garden
  • Patio
  • Barbecue grill
  • Outdoor furniture
Security/Safety
  • No carbon monoxide detector (host has indicated there is no carbon monoxide detector on the property but there are gas appliances; consider bringing a portable detector with you on the trip)
  • Smoke detector installed (host has indicated there is a smoke detector on the property)

Policies

Check-in
Check-in time starts at 4:00 pm minimum check-in age: 20
Check-out
Check-out before 11:00 am
Child Policy
Children are welcome.
Event Policy
No events allowed
Pet Policy
2 total (up to 55 lbs per pet) note from host: nous avons nous même 2 chiens. pets allowed service animals are welcome, and are exempt from fees welcoming dogs and cats only
Smoking Policy
Smoking allowed: in designated areas;non fumeur à l'intérieur dans l'ensemble du gîte

Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a smoke detector on the property host has indicated there is no carbon monoxide detector on the property but there are gas appliances; consider bringing a portable detector with you on the trip onsite parties or group events are strictly prohibited special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property accepts cash this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation this property uses a grey water recycling system and eco-friendly cleaning products

FAQ's

Is this property pet-friendly for guests?

Yes, pets are allowed at this property. Check the guest reviews to learn what guests had to share.

Does the property have a swimming pool?

No, this Aze house does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in property?

Best-rates for the Aze house starts from $193 per night with includes Entertainment, Heating, Laundry, Wellness Facilities, Barbecue/Outdoor Cooking, Child Friendly, Internet, Parking, Designated Smoking Area, TV, Bedding/Linens, Sports/Activities, Kitchen, Pet Friendly, Balcony/Terrace with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.

Is property a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this house Good or guests have recommended them suitable for families. As reported by the owner or manager, the house has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the property wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Aze house has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the property?

Based on the information reported by the owner or manager, the Aze house indicates 1 day stay policy at this house. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for property?

Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.